Rob will discuss different methods to absorb overhead in standard product costing which is an essential part of costing. Often on a project you come across various decision sticking points or questions about how you should best apply overhead. There are scenarios in which you don’t want to apply overhead evenly to all products. This scenario arises when some products absorb more overhead than others and you may be struggling to decide how to differentiate different products in terms of how they absorb overhead.
Are all products in the same clients getting the same rate and is this something you want?
How do I selectively apply Overhead in this AP?
How do I adjust for different products on the same production line?
How do I manage master data complexity?
If you have very simple rules applying a very standard overhead rate to all products, this process will be very simple. Once you get into more complex and varying different rates, you need to know how to effectively manage these different rates. You will also need to know what is the best way to schedule the varying rates.
The SAP costing sheet in its simplest form may seem inflexible as to your needs. In this session, we will address some of the misconceptions and how-to options that are available to you. The presentation will ask you to make decisions about the best way to account for your products.
How to apply percentage based overhead.
How to apply different percentages rather than being stuck with one percentage across all products.
How to use activity based overhead and not percentages.
Learn how to use fixed amounts by piece or per hour.
Rob provides a complete review of the anatomy of the costing sheet. He will discuss the three main elements: base, overhead, rate, and credit key.
Elements of the complex costing sheet
Multiple bases – cost element + origin group
Multiple overhead rates
Costing sheet assigned to material master record – overhead key – overhead group – material
Based on activity based costing, link a template (type 001) to the costing sheet
Complete formula and functions capability
Assign to material master
Examples of the templates for review
Use planned activity types and rates
Standard value applied per production order output
Rate for a product line can “flex”
Rob closes with an easy to follow summary to keep you on track when putting these great ideas into practice.